Stage 1 We’ve removed the old sleigh off the trailer. It was well built. It took awhile to dismantle the old sleigh which had loads of screws and bolts holding it together but we managed to clear everything off the trailer to see the condition of the trailer, which was in good condition and we also kept materials that can be reused and disposed of those that couldn’t.
Stage 2 is next, where we Service the trailer.
27/06 24 We’ve fully serviced the trailer today. removing the wheels, bearings, brakes, hitch, hand brake, greasing moving parts, checking the tread and condition of the tyres and pressures.
All the Lights were also checked to ensure they were working and all the connections had not corroded.